Concrete work is scheduled to begin the week of September 11, 2023, weather permitting. This work will require temporary driveway closures for some residents. Those impacted will be notified via doorhanger. Asphalt paving to follow. The street will remain closed to through traffic. Through traffic is detoured via Shiawassee St (M-52), King St, and Hickory St. Local traffic will be maintained. Any comments or questions may be submitted to the City of Owosso Engineering office, by telephone, at 989-725-0550.